Because the operator had reduced the mud density, the oil-base drillin перевод - Because the operator had reduced the mud density, the oil-base drillin русский как сказать

Because the operator had reduced th

Because the operator had reduced the mud density, the oil-base drilling fluid could not reliably suspend all fibers during the treatment. The solution was a high-density fluid that had high solids content (more than 30%) and exhibited no dynamic settling of the solids. Plugging efficiency tests performed to optimize Losseal fiber concentration showed that a 2.0- to 3.0-lbm/bbl [5.7- to 8.6-kg/m3] concentration could plug slots up to 0.2 in. [5 mm] across with a differential pressure of 1,000 psi [6.9 MPa].

The Losseal pill was prepared on location and spotted across the entire suspected thief zone, from 6,800 to 9,800 ft [2,100 to 3,000 m]. To avoid possible contamination and destabilization of the pill, which could happen should it come in contact with the drilling fluid, a weighted spacer was pumped both ahead of and behind the pill. A soft squeeze, with a low applied pressure, was then performed to help initiate the bridging and plugging mechanism of
the LCM particles. A total squeeze pressure of
250 psi [1.7 MPa] was applied and no pressure reduction was observed, indicating that the Losseal natural fracture pill had sealed off the loss zone. The reestablishment of full circulation immediately following the treatment was another proof of success. Drillers were also able to maintain full circulation throughout the cementing treatment by adding this LCM fiber to all fluids, the weighted spacer and the cement for the rest of the job. Pressure tests verified that the measured pressures matched the design pressures, indicating that the treatment had worked as expected (below right).

Treatment for reservoir drilling—When lost circulation occurs while drilling through a reservoir section, operators must stem fluid loss or risk damaging the zone’s producibility. Schlumberger engineers have developed a family of reinforced composite mat pills made of a blend of dissolvable fibers to provide lost circulation mitigation in naturally fractured reservoirs, carbonate formations and depleted reservoirs; the pills are designed to plug fractures that have widths from 1 to 5 mm. The pills have three components: viscosifiers, fibers and solids. The combination remains stable long enough over a broad range of bottomhole temperatures to allow well completions but then degrades with time, leaving the formation undamaged. The Losseal reservoir lost circulation treatment, which can pass through drillbit nozzles as small as 6.35 mm [0.250 in.] and through downhole logging equipment, eliminates the need to pull out of the hole to accommodate pumping of the pill.

The relationship between fiber degradation and plug stability has been established through laboratory experiments. In these experiments, developers create a plug inside a metal tube connected to a pump. The tube is then placed in an oven, and a continuous flow of a fluid analogous to the drilling fluid is applied at high pressure. The resulting pressure response is monitored versus time. A sudden pressure drop indicates that the plug material is starting to degrade and be cleaned away and that permeability is being restored (above). Engineers used the results from these experiments to establish pill formulation guidelines. Factors that affect the performance of this fibrous pill solution include fluid viscosity, fiber concentration, fiber geometry, flow rate and fracture width. Engineers are currently working to extend the temperature stability of the Losseal fibers beyond their rating of 85oC [185oF], and mid- and high-temperature fibers are being tested in the field to confirm both plugging performance and temperature stability performance up to 150oC [300oF].
0/5000
Источник: -
Цель: -
Результаты (русский) 1: [копия]
Скопировано!
Поскольку оператор сократил плотности грязи, нефтяной основе бурового раствора может не приостанавливает надежно все волокна во время лечения. Решение было высокой плотности жидкости, которая высоким содержанием (более 30%) и выставлены не динамического оседание твердых тел. Подсоединением эффективности тестов, выполненных для оптимизации Losseal волокна концентрации показали, что концентрация [5,7 - до 8,6 кг/м3] 2.0 - до 3.0-lbm/баррель может подключить слот до 0,2 мм [5] через дифференциального давления 1000 [6,9 МПа] psi. Losseal таблетки был подготовлен на месте и увидел через зону всего подозреваемых вор от 6,800 до 9,800 футов [2100 до 3000 м]. Чтобы избежать возможного загрязнения и дестабилизации таблеток, что может случиться, если он вступают в контакт с бурового раствора, взвешенный распорку был накачан как впереди, так и за таблетку. Мягкий выжать, с низким давлением прикладной, затем была проведена, чтобы помочь инициировать преодоление и подсоединением механизмаLCM частицы. Общее давление давление250 psi [1.7 MPa] was applied and no pressure reduction was observed, indicating that the Losseal natural fracture pill had sealed off the loss zone. The reestablishment of full circulation immediately following the treatment was another proof of success. Drillers were also able to maintain full circulation throughout the cementing treatment by adding this LCM fiber to all fluids, the weighted spacer and the cement for the rest of the job. Pressure tests verified that the measured pressures matched the design pressures, indicating that the treatment had worked as expected (below right).Treatment for reservoir drilling—When lost circulation occurs while drilling through a reservoir section, operators must stem fluid loss or risk damaging the zone’s producibility. Schlumberger engineers have developed a family of reinforced composite mat pills made of a blend of dissolvable fibers to provide lost circulation mitigation in naturally fractured reservoirs, carbonate formations and depleted reservoirs; the pills are designed to plug fractures that have widths from 1 to 5 mm. The pills have three components: viscosifiers, fibers and solids. The combination remains stable long enough over a broad range of bottomhole temperatures to allow well completions but then degrades with time, leaving the formation undamaged. The Losseal reservoir lost circulation treatment, which can pass through drillbit nozzles as small as 6.35 mm [0.250 in.] and through downhole logging equipment, eliminates the need to pull out of the hole to accommodate pumping of the pill.The relationship between fiber degradation and plug stability has been established through laboratory experiments. In these experiments, developers create a plug inside a metal tube connected to a pump. The tube is then placed in an oven, and a continuous flow of a fluid analogous to the drilling fluid is applied at high pressure. The resulting pressure response is monitored versus time. A sudden pressure drop indicates that the plug material is starting to degrade and be cleaned away and that permeability is being restored (above). Engineers used the results from these experiments to establish pill formulation guidelines. Factors that affect the performance of this fibrous pill solution include fluid viscosity, fiber concentration, fiber geometry, flow rate and fracture width. Engineers are currently working to extend the temperature stability of the Losseal fibers beyond their rating of 85oC [185oF], and mid- and high-temperature fibers are being tested in the field to confirm both plugging performance and temperature stability performance up to 150oC [300oF].
переводится, пожалуйста, подождите..
Результаты (русский) 2:[копия]
Скопировано!
Поскольку оператор уменьшил плотность бурового раствора, масло база бурового раствора не может надежно приостановить все волокна в процессе обработки. Решение было высокой плотности жидкости , которая имела высокое содержание твердого вещества (более 30%) и не обнаруживали динамического оседание твердых частиц. Затыкать тесты эффективности , выполненные с целью оптимизации Losseal концентрации волокон показали , что 2.0- до 3.0-ЛБМ / баррель [5.7- до 8,6 кг / м3] концентрация может подключить слоты до 0,2 дюйма. [5 мм] по дифференциальным давлением 1000 фунтов на квадратный дюйм [6,9 МПа].

Losseal таблетка была подготовлена на месте и увидел во всей подозреваемой зоне вора, от 6,800 до 9,800 футов [2100 до 3000 м]. Во избежание возможного загрязнения и дестабилизацию таблетки, которая может произойти , если она придет в контакт с буровым раствором, взвешенная проставка прокачивали как впереди и позади таблетки. Мягкий отжимают, с низким приложенного давления, затем осуществляли , чтобы помочь инициировать мостиков и закупоривание механизм
частиц LCM. Общее давление выжимка
250 фунтов на квадратный дюйм [1,7 МПа] применялась и не наблюдалось снижения давления, что свидетельствует о том , что Losseal таблетки естественный перелом был оцепили зону потери. Восстановление полного обращения сразу же после лечения был еще одним доказательством успеха. Бурильщики также были в состоянии поддерживать полную циркуляцию на протяжении всего лечения цементирования путем добавления этого LCM волокна ко всем жидкости, взвешенную распорку и цемент для остальной части работы. Испытания давлением подтвердили , что измеренные давление соответствует давлению конструкции, показывая , что лечение работал , как ожидалось (внизу справа).

Лечение водохранилища бурильно-При потери циркуляции происходит в процессе бурения через участок пласта, операторы должны остановить потерю жидкости или риск повреждения для зоны продуктивность. Инженеры компании Schlumberger разработали семейство армированных композиционных мат таблетки , изготовленные из смеси волокон растворимыми , чтобы обеспечить смягчение потеря циркуляции в естественно трещиноватых коллекторах, карбонатных пластах и истощенных пластах; таблетки предназначены для подключения трещин , которые имеют ширину от 1 до 5 мм. Таблетки имеют три компонента: загустители, волокна и твердые частицы. Сочетание остается стабильной достаточно долго , в широком диапазоне температур, забойными позволяют заканчивания скважин , а затем деградирует со временем, в результате чего образование неповрежденными. Losseal резервуар потерял лечение кровообращения, которое может проходить через Drillbit сопел размером до 6,35 мм [0,250 в.] И через скважинного каротажного оборудования, устраняет необходимость вытащить из отверстия для размещения накачку таблетки.

Взаимосвязь между деградацией волокна и стабильность вилка была установлена с помощью лабораторных экспериментов. В этих экспериментах, разработчики создают пробку внутри металлической трубки , соединенной с насосом. Затем трубку помещают в печь, и непрерывный поток текучей среды аналогично бурового раствора применяется при высоком давлении. Полученный в результате реакции давление контролируется в зависимости от времени. Резкое падение давления указывает на то, что вилка материал начинает деградировать и быть очищена прочь и проницаемость восстанавливается (выше). Инженеры использовали результаты этих экспериментов по разработке руководящих принципов рецептуры таблетки. Факторы, влияющие на эффективность этого волокнистого раствора таблетки включают вязкость жидкости, концентрацию волокна, геометрию волокна, скорость потока и ширины трещины. Инженеры в настоящее время работает над расширением температурной стабильности Losseal волокон за пределами их рейтинга 85oC [185oF], а также средне- и высокотемпературные волокна проходят испытания в полевых условиях, чтобы подтвердить как забивание производительность и стабильность температуры производительность до 150 ° С [300oF ].
переводится, пожалуйста, подождите..
 
Другие языки
Поддержка инструмент перевода: Клингонский (pIqaD), Определить язык, азербайджанский, албанский, амхарский, английский, арабский, армянский, африкаанс, баскский, белорусский, бенгальский, бирманский, болгарский, боснийский, валлийский, венгерский, вьетнамский, гавайский, галисийский, греческий, грузинский, гуджарати, датский, зулу, иврит, игбо, идиш, индонезийский, ирландский, исландский, испанский, итальянский, йоруба, казахский, каннада, каталанский, киргизский, китайский, китайский традиционный, корейский, корсиканский, креольский (Гаити), курманджи, кхмерский, кхоса, лаосский, латинский, латышский, литовский, люксембургский, македонский, малагасийский, малайский, малаялам, мальтийский, маори, маратхи, монгольский, немецкий, непальский, нидерландский, норвежский, ория, панджаби, персидский, польский, португальский, пушту, руанда, румынский, русский, самоанский, себуанский, сербский, сесото, сингальский, синдхи, словацкий, словенский, сомалийский, суахили, суданский, таджикский, тайский, тамильский, татарский, телугу, турецкий, туркменский, узбекский, уйгурский, украинский, урду, филиппинский, финский, французский, фризский, хауса, хинди, хмонг, хорватский, чева, чешский, шведский, шона, шотландский (гэльский), эсперанто, эстонский, яванский, японский, Язык перевода.

Copyright ©2024 I Love Translation. All reserved.

E-mail: