The first houses were built for the purpose of protecting their owners перевод - The first houses were built for the purpose of protecting their owners русский как сказать

The first houses were built for the

The first houses were built for the purpose of protecting their owners from the weather and, therefore, were very simple – a roof to keep off the rain or snow, and walls to keep out the wind.

The building erected now can be divided into two broad classifications: they are either for housing or for industrial purposes.

As far as the material is concerned, the building can be divided into stone (or brick), wood and concrete types. The brick is an artificial material made of clay then burnt to harden it. The natural stone (rubble masonry) is used for footing and foundation for external walls carrying the load. The buildings made of stone or brick are durable, fire-proof and have poor heat conductivity.

The tiers of levels which divide a building into stages or stories are called floors. These may be of timber but in stone buildings they are made of ferro-concrete details in great and small sizes.

The coverings or upper parts of buildings constructed over to keep out rain and wind and to preserve the interior from exposure to the weather, are called roofs. These should tie the walls and give strength and firmness to the construction.

Every building must be beautiful in appearance and proportional in various parts. The interior should be planned to suit the requirements of the occupants while the exterior must be simple without any excesses.

Any building should be provided with water, electricity, ventilation and heating system.

Getting water into the house is called plumbing. The plumbers have also to get the water out after it has been used. The first part of this problem is called water supply and the second one is called drainage or sewerage.



II

Almost everybody saw the construction of a building and followed its progress with interest. First the excavation is dug for a basement, then the foundation walls below ground level are constructed; after this the framework is erected and clothed with various finishing materials and protected by several coats of paint.

The part upon which the stability of the structure depends is the framework. It is intended for safety carrying the loads imposed. The floors, walls, roofs and other parts of the building must be carefully designed proportioned.

The architect or designer must decide, what the size of the walls, the floors, the beams, the girders and the parts, which make up the framework, will be and how they will be placed and arranged.

Here are the main parts of a building and their functions.

Foundations serve to keep the walls and floors from contact with the soil, to guard them against the action of frost, to prevent them from sinking and settling which cause cracks in walls and uneven floors.

Floors divide the building into stories. They may be either of timber or may be constructed of a fire-resisting material. Walls are built to enclose areas and carry the weight of floors and roofs. The walls may be solid or hollow. The materials used for the walls construction can be brick, stone, concrete and other natural or artificial materials.

Roofs cover the building and protect it from exposure to the weather. They tie the walls and give strength and firmness to the structure.



III

Turnkey construction is the type of assistance in building different facilities. In this case the employer engages the contractor to design, manufacture, test, deliver, install, complete and commission a certain project and the contractor undertakes full responsibility for the project construction and commissioning.

The contractor then undertakes endeavors to conduct a survey and design work, as well as to work out basic and detailed engineering* and supply equipment. As a rule, the contractor’s highly qualified specialists are made responsible for doing part or full construction works, carrying out installation, start up and adjustment operations*.

After the construction is completed the precommissioning starts, that is tasting, checking and meeting other requirements, which are specified in the technical handbooks.

As soon as all works is respect of the precommissioning are completed and the projects is ready for the precommissioning, the contractor notifies the engineer (Project manager) with the message. The contractor begins the commissioning immediately after the engineer does the issue of the Completion Certificate.

The contractor carries out the guarantee test during the commissioning to make sure that the project will rich the designed performance.

Operational acceptance of the project takes place when the guarantee test has been successfully completed and the guarantees met. As a rule the contractor supplies spare parts so that the project could normally operate during the maintenance guarantee period.

Turnkey contracts are always long-term undertakings involving several parties, among them foreign and local subcontractors. They are usually won as a result of tenders where the bidders compete for the contract on the terms most favourable for the customer.

0/5000
Источник: -
Цель: -
Результаты (русский) 1: [копия]
Скопировано!
The first houses were built for the purpose of protecting their owners from the weather and, therefore, were very simple – a roof to keep off the rain or snow, and walls to keep out the wind.The building erected now can be divided into two broad classifications: they are either for housing or for industrial purposes.As far as the material is concerned, the building can be divided into stone (or brick), wood and concrete types. The brick is an artificial material made of clay then burnt to harden it. The natural stone (rubble masonry) is used for footing and foundation for external walls carrying the load. The buildings made of stone or brick are durable, fire-proof and have poor heat conductivity.The tiers of levels which divide a building into stages or stories are called floors. These may be of timber but in stone buildings they are made of ferro-concrete details in great and small sizes.The coverings or upper parts of buildings constructed over to keep out rain and wind and to preserve the interior from exposure to the weather, are called roofs. These should tie the walls and give strength and firmness to the construction.Every building must be beautiful in appearance and proportional in various parts. The interior should be planned to suit the requirements of the occupants while the exterior must be simple without any excesses.Any building should be provided with water, electricity, ventilation and heating system.Getting water into the house is called plumbing. The plumbers have also to get the water out after it has been used. The first part of this problem is called water supply and the second one is called drainage or sewerage. IIAlmost everybody saw the construction of a building and followed its progress with interest. First the excavation is dug for a basement, then the foundation walls below ground level are constructed; after this the framework is erected and clothed with various finishing materials and protected by several coats of paint.The part upon which the stability of the structure depends is the framework. It is intended for safety carrying the loads imposed. The floors, walls, roofs and other parts of the building must be carefully designed proportioned.The architect or designer must decide, what the size of the walls, the floors, the beams, the girders and the parts, which make up the framework, will be and how they will be placed and arranged.Here are the main parts of a building and their functions.Foundations serve to keep the walls and floors from contact with the soil, to guard them against the action of frost, to prevent them from sinking and settling which cause cracks in walls and uneven floors.Floors divide the building into stories. They may be either of timber or may be constructed of a fire-resisting material. Walls are built to enclose areas and carry the weight of floors and roofs. The walls may be solid or hollow. The materials used for the walls construction can be brick, stone, concrete and other natural or artificial materials.Roofs cover the building and protect it from exposure to the weather. They tie the walls and give strength and firmness to the structure. IIITurnkey construction is the type of assistance in building different facilities. In this case the employer engages the contractor to design, manufacture, test, deliver, install, complete and commission a certain project and the contractor undertakes full responsibility for the project construction and commissioning.The contractor then undertakes endeavors to conduct a survey and design work, as well as to work out basic and detailed engineering* and supply equipment. As a rule, the contractor’s highly qualified specialists are made responsible for doing part or full construction works, carrying out installation, start up and adjustment operations*.After the construction is completed the precommissioning starts, that is tasting, checking and meeting other requirements, which are specified in the technical handbooks.As soon as all works is respect of the precommissioning are completed and the projects is ready for the precommissioning, the contractor notifies the engineer (Project manager) with the message. The contractor begins the commissioning immediately after the engineer does the issue of the Completion Certificate.The contractor carries out the guarantee test during the commissioning to make sure that the project will rich the designed performance.Operational acceptance of the project takes place when the guarantee test has been successfully completed and the guarantees met. As a rule the contractor supplies spare parts so that the project could normally operate during the maintenance guarantee period.Turnkey contracts are always long-term undertakings involving several parties, among them foreign and local subcontractors. They are usually won as a result of tenders where the bidders compete for the contract on the terms most favourable for the customer.
переводится, пожалуйста, подождите..
Результаты (русский) 3:[копия]
Скопировано!
первые дома были построены для защиты их владельцев от погоды и, таким образом, были очень простой – крыша, держаться подальше от дождя или снега, и стены пускать ветра.здание возведено теперь можно разделить на две широкие категории: они либо для жилья или для промышленных целей.что касается материала, то здание может быть разделена на камне (или кирпич, дерево и конкретных типов.кирпич - это искусственный материал из глины, затем сожжен харден.природного камня (обломков кирпича) используется для основы и основы для внешних стен, перевозящего груз.здания сделаны из камня или кирпича долговечны, несгораемым и низкой теплопроводностью.уровни уровнях, которые разделяют здание на этапы или рассказы называются этажами.они могут быть древесины, но в каменные здания, они сделаны из железобетонных детали в больших и малых размеров.перекрытия или верхней части здания, построенные на себе дождя и ветра и сохранение внутренних дел от воздействия погоды, называются крыши.они должны связать стены и придать силу и твердость в строительстве.каждое здание должно быть красивым внешне, и пропорциональным в различных частях.внутренних дел должны быть запланированы под потребности людей, а снаружи должна быть простой без эксцессов.любое здание, должны быть обеспечены водой, электричеством, вентиляции и отопления.попадания воды в доме называется водопровод.водопроводчиков также, чтобы получить воду после того, как она используется.в первой части этой проблемы называется водоснабжения и второй называется дренажных или канализации.IIпочти все видели, что строительство здания и следят за его прогресс с интересом.первые раскопки, вырытых на подвал, то фонд стены подземной уровня строятся; после этого рамки возведена и одеждой с различными материалами отделки и защищены несколько слоев краски.стороны, от которых зависит стабильность структуры рамок.он предназначен для охраны, несущих нагрузок навязывать.полы, стены, крышу и других частей здания должны быть тщательно разработанные пропорции.архитектор и дизайнер должен принять решение о том, что размер стены, полы, балки, перекладин и частей, которые составляют основу, будут и как они будут размещаться и организовал.вот основные элементы зданий и их функции.фонды призваны сохранить стены и полы от контакта с земли, для защиты их от действий фрост, для предотвращения их от гибели и урегулирования, которые вызывают трещины в стенах и неровные полы.полы разделить здание в истории.они могут быть либо древесины или могут быть изготовлены из огня сопротивление материала.возводятся стены, настоящим районах и вес этажей и крыш.стены могут быть твердыми и неубедительно.материалы, используемые для стен, строительство может быть кирпич, камень, конкретных и других природных и искусственных материалов.крыши покрытия здания и защитить его от воздействия погоды.они связывают стены и придать силу и твердость в структуре.IIIстроительство "под ключ" - это вид помощи в строительство различных объектов.в этом случае работодатель занимается подрядчик - разработка, производство, испытание, доставку, монтаж, полного и комиссии конкретного проекта и подрядчик берет на себя всю ответственность за строительство и ввод в эксплуатацию.подрядчик, то обязуется стремится провести обследование и проектные работы, а также работы из основных и подробная техническая * и поставки оборудования.как правило, подрядчик высококвалифицированные специалисты, ответственность за такое участие или полной строительных работ, выполнении установки, запуска и операций по корректировке *.после строительных работ в precommissioning начинается, это вкус, проверки и удовлетворения других потребностей, которые указаны в технических справочников.после того, как все работает, уважение к precommissioning завершены и проектов готов к precommissioning контрактор уведомляет инженер (руководитель проекта) с сообщением.подрядчик начинает в эксплуатацию сразу после того, как инженер делает вопрос о завершении работ.контрактор осуществляет гарантировать испытания во время ввода в эксплуатацию, чтобы убедиться в том, что проект будет богат конструкции работы.оперативное принятие проекта происходит, когда гарантия тест был успешно завершен, и гарантии соблюдены.как правило, подрядчик поставок запасных частей, так что проект может обычно действуют в обслуживании гарантийного периода.готовые контрактов всегда долгосрочных мероприятий с участием нескольких участников, среди них иностранных и местных субподрядчиков.они, как правило, не в результате торгов, где участники соревнуются за контракт на условиях, наиболее благоприятных для cust
переводится, пожалуйста, подождите..
 
Другие языки
Поддержка инструмент перевода: Клингонский (pIqaD), Определить язык, азербайджанский, албанский, амхарский, английский, арабский, армянский, африкаанс, баскский, белорусский, бенгальский, бирманский, болгарский, боснийский, валлийский, венгерский, вьетнамский, гавайский, галисийский, греческий, грузинский, гуджарати, датский, зулу, иврит, игбо, идиш, индонезийский, ирландский, исландский, испанский, итальянский, йоруба, казахский, каннада, каталанский, киргизский, китайский, китайский традиционный, корейский, корсиканский, креольский (Гаити), курманджи, кхмерский, кхоса, лаосский, латинский, латышский, литовский, люксембургский, македонский, малагасийский, малайский, малаялам, мальтийский, маори, маратхи, монгольский, немецкий, непальский, нидерландский, норвежский, ория, панджаби, персидский, польский, португальский, пушту, руанда, румынский, русский, самоанский, себуанский, сербский, сесото, сингальский, синдхи, словацкий, словенский, сомалийский, суахили, суданский, таджикский, тайский, тамильский, татарский, телугу, турецкий, туркменский, узбекский, уйгурский, украинский, урду, филиппинский, финский, французский, фризский, хауса, хинди, хмонг, хорватский, чева, чешский, шведский, шона, шотландский (гэльский), эсперанто, эстонский, яванский, японский, Язык перевода.

Copyright ©2024 I Love Translation. All reserved.

E-mail: