As far as the material is concerned, the building can be divided into  перевод - As far as the material is concerned, the building can be divided into  украинский как сказать

As far as the material is concerned

As far as the material is concerned, the building can be divided into stone (or brick), wood and concrete types. The brick is an artificial material made of clay then burnt to harden it. The natural stone (rubble masonry) is used for footing and foundation for external walls carrying the load. The buildings made of stone or brick are durable, fire-proof and have poor heat conductivity.

The tiers of levels which divide a building into stages or stories are called floors. These may be of timber but in stone buildings they are made of ferro-concrete details in great and small sizes.

The coverings or upper parts of buildings constructed over to keep out rain and wind and to preserve the interior from exposure to the weather, are called roofs. These should tie the walls and give strength and firmness to the construction.

Every building must be beautiful in appearance and proportional in various parts. The interior should be planned to suit the requirements of the occupants while the exterior must be simple without any excesses.

Any building should be provided with water, electricity, ventilation and heating system.

Getting water into the house is called plumbing. The plumbers have also to get the water out after it has been used. The first part of this problem is called water supply and the second one is called drainage or sewerage.



II

Almost everybody saw the construction of a building and followed its progress with interest. First the excavation is dug for a basement, then the foundation walls below ground level are constructed; after this the framework is erected and clothed with various finishing materials and protected by several coats of paint.

The part upon which the stability of the structure depends is the framework. It is intended for safety carrying the loads imposed. The floors, walls, roofs and other parts of the building must be carefully designed proportioned.

The architect or designer must decide, what the size of the walls, the floors, the beams, the girders and the parts, which make up the framework, will be and how they will be placed and arranged.

Here are the main parts of a building and their functions.

Foundations serve to keep the walls and floors from contact with the soil, to guard them against the action of frost, to prevent them from sinking and settling which cause cracks in walls and uneven floors.

Floors divide the building into stories. They may be either of timber or may be constructed of a fire-resisting material. Walls are built to enclose areas and carry the weight of floors and roofs. The walls may be solid or hollow. The materials used for the walls construction can be brick, stone, concrete and other natural or artificial materials.

Roofs cover the building and protect it from exposure to the weather. They tie the walls and give strength and firmness to the structure.



III

Turnkey construction is the type of assistance in building different facilities. In this case the employer engages the contractor to design, manufacture, test, deliver, install, complete and commission a certain project and the contractor undertakes full responsibility for the project construction and commissioning.

The contractor then undertakes endeavors to conduct a survey and design work, as well as to work out basic and detailed engineering* and supply equipment. As a rule, the contractor’s highly qualified specialists are made responsible for doing part or full construction works, carrying out installation, start up and adjustment operations*.

After the construction is completed the precommissioning starts, that is tasting, checking and meeting other requirements, which are specified in the technical handbooks.

As soon as all works is respect of the precommissioning are completed and the projects is ready for the precommissioning, the contractor notifies the engineer (Project manager) with the message. The contractor begins the commissioning immediately after the engineer does the issue of the Completion Certificate.

The contractor carries out the guarantee test during the commissioning to make sure that the project will rich the designed performance.

Operational acceptance of the project takes place when the guarantee test has been successfully completed and the guarantees met. As a rule the contractor supplies spare parts so that the project could normally operate during the maintenance guarantee period.

Turnkey contracts are always long-term undertakings involving several parties, among them foreign and local subcontractors. They are usually won as a result of tenders where the bidders compete for the contract on the terms most favourable for the customer.

0/5000
Источник: -
Цель: -
Результаты (украинский) 1: [копия]
Скопировано!
Що стосується матеріалу, будівлі можна розділити на камінь або цегла, дерево і бетонні типів. Цегли є штучний матеріал з глини, то спалюється для зміцнення її. Природний камінь (щебінь кладки) використовується для основу і основою для зовнішніх стінах, несуть навантаження. Будівлі з каменя або цегельної міцний, протипожежне та бідні теплопровідність.Яруси рівнів, які ділять будівлі на етапах або історій називаються підлоги. Це можуть бути деревини, але у кам'яних будівлях вони зробили залізобетонні деталей у великих і малих розмірів.Покриття або верхній частині будівлі, побудовані за герметично дощу і вітру і зберегти інтер'єр від впливу погоди, називаються дахів. Ці слід зв'язати стіни і дати міцність і стійкість до будівництва.Кожен будинок має бути гарний зовнішній вигляд і пропорційний в різних частинах. Інтер'єр потрібно планувати для задоволення потреб з пасажирів, хоча зовнішності повинні бути простими, без особливих ексцесів.Будь-якому будинку повинні бути надані з води, електрики, вентиляції та систему опалення.Попадання води в будинку називається сантехніка. З сантехніків повинен також вийти воду після того, як вона використовується. У першій частині цієї проблеми називається водопостачання і другий називається дренажу або водовідведення. IIМайже всі побачили Будівництво будівлі а його прогресу з інтересом. Перші розкопки вирили за підвалі, то будуються цоколю нижче рівня землі; Після цього рамках зведений і одягнений з різних оздоблювальних матеріалів і охороняються кілька шарів фарби.Частина, на яких залежить від стабільності структури є рамках. Вона призначена для забезпечення безпеки, що перевозять вантажі, введені. Підлоги, стіни, дахів та інших частинах будівлі повинні бути ретельно розроблені пропорціями.Архітектор або дизайнером повинні самі вирішувати, що розмір стіни, підлоги, балки, перекладин і частин, які складають рамках, буде і як вони будуть розміщені і організовані.У цьому розділі наведено основні частини будівлі та їхні функції.Основи служити тримати стін і підлоги у контакті з грунтом, щоб охороняти їх проти дією морозу, щоб запобігти їх від затоплення і врегулювання, який викликає тріщини в стінах і нерівномірного поверху.Підлоги розділити будівлі в історії. Вони можуть бути будь-який з деревини або можуть бути виготовлені з матеріалу чинити опір вогню. Стіни вони звели укладіть районах і нести весь поверхах і дахах. Стіни можуть бути твердими або порожнисті. Матеріали, що використовуються для будівництва стіни можна, Цегла, камінь, бетон та інших природних або штучних матеріалів.Покрівлі покривають будівлі і захистити його від впливу погоди. Вони краватка стіни і дати міцність і стійкість до структури. IIITurnkey construction is the type of assistance in building different facilities. In this case the employer engages the contractor to design, manufacture, test, deliver, install, complete and commission a certain project and the contractor undertakes full responsibility for the project construction and commissioning.The contractor then undertakes endeavors to conduct a survey and design work, as well as to work out basic and detailed engineering* and supply equipment. As a rule, the contractor’s highly qualified specialists are made responsible for doing part or full construction works, carrying out installation, start up and adjustment operations*.After the construction is completed the precommissioning starts, that is tasting, checking and meeting other requirements, which are specified in the technical handbooks.As soon as all works is respect of the precommissioning are completed and the projects is ready for the precommissioning, the contractor notifies the engineer (Project manager) with the message. The contractor begins the commissioning immediately after the engineer does the issue of the Completion Certificate.The contractor carries out the guarantee test during the commissioning to make sure that the project will rich the designed performance.Operational acceptance of the project takes place when the guarantee test has been successfully completed and the guarantees met. As a rule the contractor supplies spare parts so that the project could normally operate during the maintenance guarantee period.Turnkey contracts are always long-term undertakings involving several parties, among them foreign and local subcontractors. They are usually won as a result of tenders where the bidders compete for the contract on the terms most favourable for the customer.
переводится, пожалуйста, подождите..
Результаты (украинский) 2:[копия]
Скопировано!
Що стосується матеріалу, то будівля можна розділити на камінь (або цегла), дерева і конкретних типів. Цегла являє собою штучний матеріал , виготовлений з глини обпаленої потім укріпляти його. Натуральний камінь (щебінь кладка) використовується для фундаменту і фундаменту для зовнішніх стін , несучих навантаження. Будинки , зроблені з каменю або цегли міцні, що не згорає і мають низьку теплопровідність.

Яруси рівнів , які ділять будинок на етапи або історії називаються підлоги. Вони можуть бути з дерева , але в кам'яних будівлях вони зроблені із залізобетонних деталей у великих і малих розмірів.

Покриття або верхні частини будівель , побудованих більше , щоб не пустити дощ і вітер , і зберегти інтер'єр від впливу погодних умов , є звані даху. Вони повинні зв'язати стіни і додати міцність і стійкість до будівництва.

Кожна будівля має бути красивим на вигляд і пропорційно в різних частинах. Інтер'єр повинен бути сплановані , щоб задовольнити потреби пасажирів у той час як зовнішній вигляд повинен бути простим , без яких - або ексцесів.

Будь-який будинок має бути забезпечено з водою, електрикою, системою вентиляції та опалення.

Отримання води в будинок називається сантехніка. Водопровідники повинні також отримати воду після того, як вона була використана. Перша частина цієї проблеми називається водопостачання , а другий називається дренаж або каналізацію.



II

Майже всі бачили , будівництво будівлі і стежив за його прогресом з інтересом. Спочатку розкопки закопується для фундаменту, а потім стіни фундаменту нижче рівня землі побудовані; після того, як ця структура зводиться і одягнув з різними оздоблювальними матеріалами і захищена кількома шарами фарби.

Частина , на якій стійкість структури залежить є основою. Він призначений для безпеки проведення навантаження , накладені. Підлоги, стіни, дахи та інші частини будівлі повинні бути ретельно продумані пропорціями.

Архітектор або дизайнер повинен вирішити, який розмір стін, підлог, балок, балок і частин, які складають основу, буде і як вони будуть розміщені і організовані.

Ось основні частини будівлі і їх функції.

Фундаменти служать для підтримки стін і підлоги від контакту з грунтом, щоб захистити їх від впливу морозу, щоб запобігти їх проходка і відстійники , які викликають тріщини в стінах і нерівних підлог.

підлоги розділимо будівлю на історії. Вони можуть бути або з деревини або можуть бути виконані з матеріалу , вогнезахисні. Стіни побудовані для того щоб докласти області і нести вага підлог і дахів. Стінки можуть бути суцільними або порожнистими. Матеріали , використовувані для будівництва стін може бути цегла, камінь, бетон і інші природні або штучні матеріали.

Покрівлі покриття будівлі та захистити його від впливу погодних умов . Вони пов'язують стіни і дати силу і твердість структури.



III

під ключ є вид допомоги в будівництві різних об'єктів. У цьому випадку роботодавець залучає підрядника на проектування, виробництво, випробування, постачання, монтаж, повна і ввести в експлуатацію певний проект , і підрядник бере на себе повну відповідальність за проект будівництва і введення в експлуатацію.

Підрядник потім робить зусилля , щоб провести обстеження і проектні роботи , а також виробити базові і детальний інжиніринг * і поставка обладнання. Як правило, висококваліфіковані фахівці підрядника зроблені відповідальність за це частково або повністю будівельно - монтажних робіт, проведення монтаж, пуск і налагоджувальні операції *.

Після завершення будівництва починається пуско - налагоджувальні роботи , тобто дегустації, перевірка і дотримання інших вимог, які вказані в технічних довідниках.

Як тільки всі роботи є повага до пуско - налагоджувальних робіт завершені і проекти готовий до пуско - налагоджувальних робіт , підрядник повідомляє інженер (керівник проекту) з повідомленням. Підрядник починає введення в експлуатацію відразу ж після того, як інженер робить питання про сертифікат про проходження курсу.

Підрядник здійснює перевірку гарантій під час введення в експлуатацію , щоб переконатися , що проект буде багатий проектна продуктивність.

Оперативне прийняття проекту відбувається , коли тест гарантія був успішно завершений , і гарантії , виконані. Як правило , підрядник поставляє запасні частини , щоб проект міг нормально функціонувати в протягом гарантійного обслуговування періоду.

Під ключ контракти завжди довгострокові зобов'язання з участю кількох партій, в тому числі іноземних та місцевих субпідрядників. Вони, як правило , виграли в результаті торгів , де учасники торгів змагаються за контракт на умовах , найбільш вигідних для клієнта.

переводится, пожалуйста, подождите..
Результаты (украинский) 3:[копия]
Скопировано!
AНа 20% яруси%20з 20% рівнів%20яких%20розділити%20а%20будівлі%20в 20-20%етапи 20 або 20% історії%20є%20назвав%20 поверхів.%20ці%20 травня%20бути%20з 20% деревини%20а%20в 20-20%каменю 20 будинків%20вони%20є%20зробив%20з 20% залізобетонних%20деталі%20в 20-20%великого 20 і 20% малих%20розмірів.%5Е%5 EThe%20покриттів%20або%20верхнього%20частини%20з 20% будинків%20будується%20над%20до 20% тримати%20з 20%дощ%20а%20вітер%20а%20до 20% збереження%20в%20внутрішніх%20від 20% експозиції%20до 20% у 20% погоду,%20є%20назвав%20покрівель.%20ці%20повинні%20краватка%20в%20стін%20а%20дають%20міцність%20а%20стійкість%20до 20% у 20% будівництва.%5Е%5 EEvery%20будівлі%20повинні%20бути%20красиві%20в 20-20%вигляд і 20%20пропорційна%20в 20-20%різних частин 20.%20В%20внутрішніх%20повинні%20бути%20планується%20до 20% відповідно%20в%20вимоги%20з 20% до 20% мешканців%20а%20в%20зовнішнього%20повинні%20бути%20прості%20без%20будь-%20надмірностей.%5Е%5 EAny%20будівлі%20повинні%20бути%20надав%20з%20воду,%20електрики,%20вентиляції%20а%20опалення%20системи.%5Е%5EОтримання%20води%20в 20-20-20, 20 будинку%20є%20назвав%20сантехніка.%20В%20сантехніків%20мають%20й%20до 20% отримують%20в%20води%20з 20%після%20його%20має%20б%20.%20В%20перших%20участь%20з 20% цього%20проблема%20є%20назвав%20води%20постачання%20а%20в%20другого%20один%20є%20назвав%20дренаж%20або%20каналізація.%5Е%5Е%20%5Е%5 EII%5Е%5 EAlmost%20всім%20побачив%20в%20будівництво%20з%20а%20будівлі%20а%20слідом%20її%20прогрес%20з%20 відсотків.%20перших%20в%20земляних%20є%20копали%20для%20а%20підвал,%20потім%20в%20фонд%20стін%20нижче%20землі%20рівень%20є%20конструкції;%20після%20цього%20в%20рамкової%20є%20зведений%20а%20одягаються%20з%20різних%20оздоблювальних%20матеріалів%20а%20 заповідних%20за 20% кілька%20пальто%20з 20% фарбою.%5Е%5 EThe%20участь%20після%20яких%20в%20стабільність%20з 20% до 20% структури%20залежить від 20% - 20% до 20% каркаса.%20його%20є%20призначені%20для%20безпеки%20транспортування%20в%20навантажень%20накладене.%20В%20 поверхів,%20стін,
переводится, пожалуйста, подождите..
 
Другие языки
Поддержка инструмент перевода: Клингонский (pIqaD), Определить язык, азербайджанский, албанский, амхарский, английский, арабский, армянский, африкаанс, баскский, белорусский, бенгальский, бирманский, болгарский, боснийский, валлийский, венгерский, вьетнамский, гавайский, галисийский, греческий, грузинский, гуджарати, датский, зулу, иврит, игбо, идиш, индонезийский, ирландский, исландский, испанский, итальянский, йоруба, казахский, каннада, каталанский, киргизский, китайский, китайский традиционный, корейский, корсиканский, креольский (Гаити), курманджи, кхмерский, кхоса, лаосский, латинский, латышский, литовский, люксембургский, македонский, малагасийский, малайский, малаялам, мальтийский, маори, маратхи, монгольский, немецкий, непальский, нидерландский, норвежский, ория, панджаби, персидский, польский, португальский, пушту, руанда, румынский, русский, самоанский, себуанский, сербский, сесото, сингальский, синдхи, словацкий, словенский, сомалийский, суахили, суданский, таджикский, тайский, тамильский, татарский, телугу, турецкий, туркменский, узбекский, уйгурский, украинский, урду, филиппинский, финский, французский, фризский, хауса, хинди, хмонг, хорватский, чева, чешский, шведский, шона, шотландский (гэльский), эсперанто, эстонский, яванский, японский, Язык перевода.

Copyright ©2024 I Love Translation. All reserved.

E-mail: